Slope Stability by the Simplified Bishop Method — Worked Example
Every slope-stability program, from a spreadsheet to finite-element software, answers one question: how far is this slope from failure? The classical answer for circular slip surfaces is the factor of safety from the Simplified Bishop method. This guide walks through one complete example by hand, so you can check any spreadsheet or program you use against it.
1. The problem
- Homogeneous slope, height H = 10 m, face inclination 1.5H : 1V (about 33.7°)
- Soil: c′ = 10 kPa, φ′ = 28°, γ = 19 kN/m³ (effective-stress parameters, long-term drained condition)
- Pore-pressure ratio ru = 0.25, where u = ru·γ·h in each slice
- Failure surface: circle through the toe, divided into 10 vertical slices
2. The Simplified Bishop equation
For each slice of width b and height h, with base inclination α:
W = γ·b·h u = ru·γ·h mα = cos α + (sin α · tan φ′) / F
F = Σ [ (c′·b + (W − u·b)·tan φ′) / mα ] ÷ Σ ( W · sin α )
F appears on both sides, so you iterate: guess F, compute mα, get a new F, repeat until it stops changing. The Fellenius (ordinary) method is the same idea without the interslice-force correction and gives a lower, more conservative F.
3. Slice table
Slice width b = 1.758 m. The angle α comes from sin α = (x − xc) / R, with x measured to the slice mid-point.
| Slice | h (m) | W (kN/m) | α (°) | u (kPa) |
|---|---|---|---|---|
| 1 | 0.59 | 19.8 | 0.8 | 2.8 |
| 2 | 1.66 | 55.5 | 6.0 | 7.9 |
| 3 | 2.56 | 85.7 | 11.3 | 12.2 |
| 4 | 3.30 | 110.2 | 16.6 | 15.7 |
| 5 | 3.85 | 128.7 | 22.1 | 18.3 |
| 6 | 4.21 | 140.5 | 27.9 | 20.0 |
| 7 | 4.33 | 144.5 | 33.9 | 20.6 |
| 8 | 4.17 | 139.2 | 40.4 | 19.8 |
| 9 | 3.64 | 121.5 | 47.6 | 17.3 |
| 10 | 1.44 | 48.0 | 56.1 | 6.8 |
Totals: ΣW = 993.7 kN/m and the driving term Σ W·sin α = 469.1 kN/m.
4. Iteration
| Trial F | New F |
|---|---|
| 1.300 | 1.178 |
| 1.178 | 1.156 |
| 1.156 | 1.152 |
| 1.152 | 1.151 |
| 1.151 | 1.151 |
The iteration converges to F = 1.15 within a few steps. The Fellenius method gives 1.07 for the same circle. With a required factor of safety of 1.3 to 1.5 (typical for long-term static conditions; use your project criteria) this slope does not pass.
5. What a drainage fix is worth
The same slope and the same search procedure, changing only the pore pressure:
| ru | Critical F (Bishop) |
|---|---|
| 0.25 | 1.15 |
| 0.15 | 1.28 |
| 0.10 | 1.35 |
| 0 (fully drained) | 1.48 |
Lowering ru from 0.25 to 0 raises the factor of safety by about 29%. Drainage is often the cheapest stabilisation measure, which is why pore-pressure assumptions deserve more attention than the third decimal of F.
6. Doing it in a spreadsheet
- Weight:
=gamma*b*h - Base angle:
=ASIN((xm-xc)/R) - mα:
=COS(alpha)+SIN(alpha)*TAN(phi)/F - F update:
=SUM(num_i/m_i)/SUM(W_i*SIN(alpha_i)), iterated a few times in a helper column rather than with circular references - Search: change (xc, yc) and keep the smallest F; the critical circle is the one with the lowest factor of safety, not the first one you try.
7. Limits of this method
- Circular slip surfaces and a homogeneous slope; layered soils, weak seams and benches need a more general method.
- Two-dimensional analysis; it assumes a long slope.
- Pore pressure by a single ru; a seepage analysis is better for dams and sites with a water table.
- The result depends strongly on c′ and φ′. Take them from laboratory tests on representative samples, not from tables.
Our Slope Stability Excel sheet does the full calculation with live formulas: Simplified Bishop with automatic iteration, a Fellenius cross-check, pore-pressure ratio ru, crest surcharge, horizontal seismic coefficient, a drawing of the slope and slip circle, and a table of slices. Use the worked example above to test any sheet or program: same inputs, same answer.
Related worked examples
- Lateral Earth Pressure: Rankine Active, At-Rest and Passive — A Worked Example with Water and Surcharge
- Proctor Compaction Test — Optimum Water Content and Maximum Dry Density Worked Example
This article is an educational summary for preliminary checks. Final slope design needs a site investigation, the criteria of your project and the judgement of the engineer in charge.
Slope Stability Excel Sheet — Simplified Bishop with ru, Surcharge and Seismic Coefficient — Bilingual
Factor of safety of a homogeneous slope against a circular toe failure by the Simplified Bishop method (with Fellenius as a cross-check), wi…
More guides
Proctor Compaction Test — Optimum Water Content and Maximum Dry Density Worked Example
Foundation Settlement Worked Example — Immediate and Consolidation Settlement
Bearing Capacity of a Square Footing — Terzaghi vs Meyerhof Worked Example
Atterberg Limits Chart and USCS Classification — Four Worked Examples (CL, CH, ML, SC)
CPT-Based Liquefaction Triggering: The Simplified Method Step by Step, with a Worked Example