Laboratory testing

Proctor Compaction Test — Optimum Water Content and Maximum Dry Density Worked Example

📅 2026-11-16⏱ 8 min read📶 Intermediate✍️ RastaWorks team

The compaction test looks simple, but two common mistakes ruin it: reading the highest test point as the optimum, and never checking the data against the zero-air-voids curve. This guide reduces one complete Proctor data set by hand, so you can check any spreadsheet or program against it. It covers the fitted curve, the optimum water content, the maximum dry unit weight, the checks that catch bad data, a field compaction check and the oversize correction.

1. The data

For each point: wet density ρ = (mass of mold + wet soil − mold mass)/V; water content w = (wet soil + can − dry soil + can)/(dry soil + can − can) × 100; dry density ρd = ρ/(1 + w); dry unit weight γd = ρd × 9.81.

Pointρ wet (g/cm³)w (%)ρd (g/cm³)γd (kN/m³)γd,ZAV (kN/m³)S (%)
11.9019.01.74417.1121.3144
21.96811.01.77317.3920.4257
32.02813.01.79417.6019.6170
42.06915.01.79917.6518.8581
52.10117.01.79517.6118.1591
62.10919.01.77217.3917.5198

The zero-air-voids value is γd,ZAV = Gs·γw/(1 + w·Gs), and the degree of saturation of each point is S = w·Gs/(Gs·γw/γd − 1).

2. Fit the curve, do not pick the highest point

The highest test point is point 4 (γd = 17.65 kN/m³ at w = 15%). The true peak lies between points, so we fit a least-squares parabola through all six points, γd = a·w² + b·w + c:

510152016182022zero air voids (S = 100%)95% of maximumw_opt = 14.9%, γd,max = 17.66water content w (%)dry unit weight γd (kN/m³)

3. Checks that catch bad data

4. The water-content range for 95% compaction

Setting γd = 0.95 × 17.66 = 16.77 kN/m³ in the parabola gives two water contents, 7.4% on the dry side and 22.5% on the wet side. Look at them before using them: both lie outside the tested range of 9% to 19%, so they are extrapolations of a parabola. A parabola is only an approximation of the real curve, which usually falls faster on the wet side. In this example the fitted parabola crosses the zero-air-voids curve at w ≈ 19.6%, just beyond the last test point; above that value it would plot over the S = 100% limit, which is physically impossible. The wet-side limit of 22.5% is therefore not usable. Use such a range as an indication, and test points closer to the limits if the project depends on them.

5. Field check: relative compaction

Relative compaction is RC = ρd,field/ρd,max × 100. Suppose a field test (sand cone, for example) gives an assumed wet density of 1.95 g/cm³ at w = 12.5%. Then ρd,field = 1.95/1.125 = 1.733 g/cm³ and RC = 1.733/1.800 = 96.3%. The minimum RC and the allowed water-content band come from the project specification, not from this article; values such as 95% or 98% are common, but they are not universal.

6. Oversize correction (ASTM D4718)

When the soil contains a fraction Pc retained on the sieve that the mold does not allow, the laboratory result must be corrected. As an illustration, take Pc = 10%, Gs of the oversize 2.65 and its water content 2%:

Comparing field density with the uncorrected laboratory value would understate or overstate RC for such a soil.

7. Reproduce it in a spreadsheet

Enter method = Standard (ASTM D698), V = 944, mold mass = 4200, Gs = 2.70, oversize Pc = 0, and for the six points the data of the table (mold + wet soil: 5995, 6058, 6114, 6153, 6183, 6191 g; wet soil + can: 63.6, 64.4, 65.2, 66.0, 66.8, 67.6 g; dry soil + can: 60 g; can: 20 g for every point). You should get wopt = 14.9%, γd,max = 17.66 kN/m³ and R² = 0.994.

8. Limits of this example

Our Proctor Compaction Excel sheet does this data reduction with live formulas: six compaction points, a least-squares fit with wopt, γd,max and R², zero-air-voids and S = 90% curves, the water-content range for 95% compaction, the ASTM D4718 oversize correction, quality checks and a printable A4 report. Use the worked example above to test any sheet or program: same inputs, same answer.

Related worked examples

This article is an educational summary for preliminary checks. Compaction requirements must follow the project specification and the judgement of the engineer in charge.

🏗️

Proctor Compaction Test Analysis Excel Sheet — Optimum Water Content, γd,max and Zero-Air-Voids — Bilingual

Full compaction data reduction with live formulas: wet and dry densities of 6 points, fitted compaction curve, optimum water content and max…

View sheet

Questions? Chat on WhatsApp


More guides

Foundation Settlement Worked Example — Immediate and Consolidation Settlement

Bearing Capacity of a Square Footing — Terzaghi vs Meyerhof Worked Example

Slope Stability by the Simplified Bishop Method — Worked Example

Atterberg Limits Chart and USCS Classification — Four Worked Examples (CL, CH, ML, SC)

Lateral Earth Pressure: Rankine Active, At-Rest and Passive — A Worked Example with Water and Surcharge

CPT-Based Liquefaction Triggering: The Simplified Method Step by Step, with a Worked Example